Safe Clean Drinking Water Project
D.M. White Architecture Inc. provided architectural services for this $217 million rehabilitation of the City of Saint John water supply infrastructure and was embedded with a large engineering consortium providing design and construction management services. This highly technical infrastructure project required intensive engineering and architectural coordination and was delivered using design/build/finance procurement to a tight schedule.
The water treatment plant, administration building, and site development were planned to meet the design criteria of the project requirements and insulated to 25% better than the 2011 National Energy Code of Canada. D.M. White Architecture Inc. provided all building conceptual design, construction drawings and specifications, and construction administration. This multiple award-winning project received an Award of Excellence from ACEC NB in 2019.